MEZIC Energy Storage
Supplier-presented hybrid inverters, battery storage, all-in-one ESS and PCBA/SKD cooperation. Current entity registered in Foshan in 2016; model-level approval and service checks remain open.
Energy products, by application.
Hybrid & Off-grid Inverters
The supplied catalogue covers single-phase and three-phase hybrid products, off-grid/on-off-grid configurations, and split-phase variants. A suffix such as EU or US describes the supplier model designation; it does not prove local approval. Confirm voltage, phase, frequency, grid mode and battery protocol before choosing a model.
Grid-tied & Microinverters
Supplier-presented string and microinverter families for different PV applications. Check the exact datasheet revision, grid-code documents, utility requirements, installation environment and monitoring accessories.
LFP Batteries & All-in-one ESS
The catalogue describes lithium iron phosphate battery and integrated storage families. Match battery-pack identity, BMS/firmware, inverter compatibility, transport test summary and system safety documentation; component claims do not establish complete-system acceptance.
PCBA / SKD Cooperation
The catalogue and supplier website advertise OEM, ODM and SKD support. Confirm assembly scope, BOM, software and branding rights, final testing, traceability, regulatory responsibility and warranty support for the target country.
Supplier material, clearly attributed.





Images supplied in the product catalogue; they do not establish an independent factory visit or verified capacity.
What the registry confirms, and what stays open.
Manufacturing in registered scope
The commercial registry snapshot returned photovoltaic equipment, batteries and electronic-component manufacturing, plus goods and technology import/export clauses. This is a registry review, not an on-site production audit.
Supplier manufacturing material
The catalogue shows SMT, assembly, ATE testing and aging workshops. Staff, floor area and annual capacity remain supplier statements; no independent production records or shipment audit were supplied.
Engineering & service checks
Request an exact model/market document matrix, battery compatibility records, current manuals, firmware support and a written spare-parts/repair arrangement before a sample or production order.
What was checked — and what the check found.
Review date: 23 October 2026. The registry snapshot and risk response are commercial database returns, not a competent-authority legal determination. The risk response includes share pledges, litigation initiated by the company and historical mentions; confirm the underlying records and current position before material commitments.
MEZIC, with the evidence boundaries visible.
Guangdong Mezic Tech Co., Ltd. (广东美智智能科技有限公司), credit code 91440606MA4UX6BK17, is the current entity identified in the commercial registry return. Its registered address is Building A3, Shunxin City, Fusheng West Road, Ronggui, Shunde, Foshan. The Chinese registered name and credit code should identify the contracting party.
Supplier materials describe a business origin in 2006, while the current entity was registered on 2 November 2016. The relationship between the earlier business and current entity remains to be documented. The supplier describes more than 400 employees and over 80 R&D engineers; the registry return contains 194 insured contributors. These are different measures and may have different dates.
The catalogue states inverter capacity of more than one million sets a year, while the general website describes twenty million controller sets annually. These are different product baskets, not interchangeable shipment figures. MOQ, lead time, warranty allocation and current export markets were not established from the materials supplied.
Brand history, and the current entity.
Business origin — supplier statement
The catalogue and website use this history. Predecessor/current-entity relationship remains open.
Current company registered
Commercial registry return gives 2 November 2016 for the present entity.
Registry and materials reviewed
Current catalogue, Chinese and English websites and commercial registry/risk returns reviewed on 23 October. Model-level documents remain open.
Choose the system for the actual site.
Residential PV & Backup
Define essential loads, grid mode, battery chemistry/protocol and installation conditions. Do not assume a transfer-time statement proves UPS suitability.
Distributor & Installer Supply
Specify country, utility area, exact model, certificates, local importer, spare parts and repair responsibility.
Brand & Local Assembly
OEM/SKD cooperation needs written testing, traceability, firmware, intellectual-property and product-responsibility boundaries.
Sourcing guides for this category
The 27-Point China Factory Audit Checklist
Product Inspection in China Before Shipment: A Buyer's Guide
How to Request a Sample from a Chinese Factory (Without Getting Burned)
What Documents to Request From a Chinese Supplier Before Your First Order
More verified factories
Hengkai Printing
Hongye Packing Material
Huayu Packaging
Dongguan Petop Pet Toys (东莞市派拓实业有限公司)
Frequently Asked Questions
Is MEZIC a manufacturer?
The current commercial registry scope includes photovoltaic equipment, batteries and electronic-component manufacturing. The catalogue shows manufacturing workshops. CMH has reviewed registration and supplier material; it has not carried out an on-site capacity audit.
Are product certificates verified?
No model-specific issuer-verifiable originals have been checked in this review. Supplier references to CE, ISO, IATF, AEO or other standards are not a substitute for product-level evidence or destination approval.
Which date should be used for the company?
The supplier describes a 2006 business origin. The current Chinese registered entity was established on 2 November 2016. Ask for the predecessor relationship before using a continuous corporate-history claim.
What information is needed for a quote?
Send the destination and utility area, required output, phase and frequency, grid/off-grid mode, loads, battery model/protocol, installation environment, quantity, sample needs and service expectations. Confirm MOQ, lead time and warranty in the written quotation.
Does an EU/US model suffix mean approval?
No. Confirm the complete model and configuration against current certificates, local grid requirements, import obligations and installation acceptance. SKD assembly does not remove these responsibilities.
Talk to MEZIC Energy Storage directly.
Send your destination, system configuration and purchasing role. Request exact model documents, compatibility records and a written sample/production and service plan. CMH will route the enquiry.
