A power adapter factory audit checklist for China that you copy from a generic sourcing template will send you counting fire extinguishers and photographing the canteen. Those things matter for a social audit. They tell you almost nothing about whether the 30,000 chargers you are about to order will pass hipot, stay inside their no-load power limit, and survive the first week of a customer plugging and unplugging them. A switching power supply is a mains-connected product with a fire and shock case attached to every unit; the audit that predicts a good order looks at the twelve places where that risk is either controlled or ignored.
This article assumes you have one working day inside the plant, that you already did the paperwork check on the documents a Chinese supplier should hand over before a first order, and that you are auditing a factory building adapters, USB-C PD chargers, wireless chargers or LED drivers in the 1–240 W range. If you are auditing a wire-harness shop or a box-build contract assembler, the priorities are different and this list will mislead you.
Before you walk in: what the plant and the office each own
Chinese power-supply suppliers are often organised as two legal entities — an inland manufacturing company and a coastal commercial company that handles engineering front-end, certification and export. Lexiang Power is a clear example: the plant is Yichang Sanshengyuan Technology Co., Ltd., a 5,000 square metre facility in Yiling District, Yichang, Hubei, while the commercial head office is Shenzhen Enjoy Charging Technology Co., Ltd. in Bao'an District, Shenzhen. Inland Hubei gives lower labour and floor cost than a coastal plant of the same size; Shenzhen gives same-day access to the component market, the test houses and the freight forwarders.
For your audit this has one hard consequence: the site you visit must be the site that will build your product. Ask, in writing, before you book the flight, which address the production will run at and which entity's name will appear on the safety file. Then confirm on arrival that the plant signage, the business licence on the wall and the name on the safety-file cover page agree. A plant that cannot show its own licence at reception is either a subcontractor or a showroom.
The second thing to settle before arrival is headcount by function. A plant stating 200-plus staff of whom over 40 are engineering and quality personnel is claiming roughly one technical person per four or five operators. On the day, that ratio should be visible at the line, not only in an office upstairs. Ask who signs off a component substitution and who reviews burn-in fails, and see whether those are people you met on the floor.
The twelve checkpoints, in the order you will meet them
Work the building in material-flow order: incoming goods, SMT, wave solder, final assembly, test, burn-in, packing. Each item below takes under thirty minutes.
1. Incoming inspection of mains-side safety components
This is the most predictive check in an adapter plant and the one most templates skip. Four component families sit directly across the mains or the isolation barrier: X and Y capacitors, the input fuse or fusible resistor, the optocoupler, and the bridge rectifier. A substituted Y capacitor from an unapproved vendor is the classic cause of a hipot pass in the factory and a field failure six months later. Ask to see the incoming inspection (IQC) records for these four families specifically. You want to see: the approved vendor list, the part number on the reel matching the part number on the safety file's critical components list, and a record of what was checked on receipt. If the answer is "the supplier certifies them," that is a gap. Lexiang's public profile does not state its incoming-inspection policy for mains-side components; request it before you visit rather than discovering it on the day.
2. Critical components list against the physical board
Bring a printed copy of the critical components list from the safety report for the model closest to yours. Pull a board off the line and match the transformer marking, the Y-capacitor marking, the fuse and the optocoupler part number against that list, line by line. Any deviation without a documented alternate approved by the certification body means the safety file no longer describes the product being built. This takes fifteen minutes and finds more problems than an hour of touring.
3. Transformer winding and margin tape control
The transformer is the isolation barrier. Whether it is wound in-house or bought in, ask to see how creepage is controlled: margin tape, triple-insulated wire, or a bobbin with physical barriers. Then ask how the winder verifies it — a visual check per lot, or a hipot on the bare transformer before it goes to the board. Insider detail: a plant that hipot-tests transformers at the winding stage rather than waiting for the finished product catches barrier faults before they are potted, soldered and cased, which is when they become expensive.
4. SMT line: solder paste control and inspection method
Ask the number of SMT lines and their placement rate, then compare with the stated capacity. Lexiang states annual capacity of five million chargers and five million power supplies but its public profile names the processes, not the line count — ask for the count directly and do not infer it from the capacity figure. On the line itself look for three things: solder paste stored cold and logged in and out of the fridge with time stamps, a solder paste inspection (SPI) or at minimum an AOI station after reflow, and a reflow profile chart pinned to the oven with a date. The inspection sequence a PCBA line should run applies to an adapter board just as it does to any other assembly.
5. Through-hole and wave solder
Adapter boards carry large through-hole parts — bulk capacitors, transformers, common-mode chokes — so wave soldering quality decides most of the mechanical reliability. Lead-free wave soldering is the norm for RoHS shipments; ask to see the wave temperature log and the flux type in use, and turn a wave-soldered board over to look for solder bridges between the primary and secondary areas, which are the ones that matter. A plant that runs a selective solder or a well-fixtured wave will show clean separation across the isolation slot.
6. Final assembly: housing, ultrasonic welding and pin retention
Most adapter housings are ultrasonically welded rather than screwed. Ask how weld depth is checked — typically a tear-down of a set number of units per shift — and ask to see the last shift's destructive-test units. Then check plug-pin retention: for a folding-pin or fixed-blade housing, the pins must hold under the pull and torque tests in the relevant plug standard.
7. Hipot and ground continuity at 100%
Every mains-connected adapter must pass a dielectric strength test at end of line, on every unit, not on a sample. Watch the test station for ten minutes. You want to see the test voltage and duration displayed on the tester, a physical fixture that engages both the plug pins and the output connector, a pass/fail indicator that stops the operator, and a log. Insider detail: many plants run production hipot at a reduced duration (one or two seconds) compared with the type-test duration in the standard, which is permitted, but the voltage must still be the full value for the insulation class. Ask which voltage is set and why.
8. Functional and combined test: what is actually measured
In-process combined testers are typical in an adapter plant: one station measures output voltage under load, ripple, no-load input power, efficiency at set load points and protection behaviour (over-current, short circuit). Lexiang's plant lists in-process combined testers and a burn-in stage on its profile. Ask to see the pass/fail limits programmed into that tester for a model near yours and compare them to the datasheet. Limits set wider than the spec are a quiet way of raising yield.
9. Burn-in: duration, temperature, load and what happens to fails
Automated burn-in racks are the norm; what varies is how they are used. Ask three questions: how many hours, at what ambient, and under what load percentage. Then ask whether burn-in is 100% or a sample per lot, and whether a burned-in unit is re-tested on the functional tester afterwards. Lexiang's profile lists automated burn-in racks but does not publish rack capacity, duration or temperature; get those figures in writing before the visit and check them against the racks on the day. A rack full of units with no load applied is warming shelves, not burning in.
10. Environmental and mechanical test lab
For a plant claiming an in-house lab — Lexiang lists a salt-spray chamber, high/low-temperature chamber, drum-drop and cable-flex testers — look at the log books, not the equipment. A salt-spray chamber whose last entry is four months old is not part of the process. Ask what the drop height, drop count and cable-flex cycle count are for a standard release test, and which pass criteria apply. If you get a clear answer with a number, ask for the last three reports.
11. Marking, traceability and laser marking
Rating labels must carry the correct model, input and output ratings, the safety-mark file number and the entity name. Ask how the plant stops the wrong label going on the wrong housing when several plug variants of the same model run in parallel. UV laser marking on the housing makes a swap harder but not impossible. Pull three units from the packing line and read the labels against the certificate.
12. Packing, lot identification and outgoing inspection
Finally, confirm the outgoing QC sampling plan — the AQL levels for critical, major and minor defects — and check that the lot number on the carton can be traced back to a date, a line and a set of test logs. If the factory cannot connect a carton to a burn-in log, a field failure will be impossible to investigate.
Scoring the day: a table you can fill in on the plane home
| Checkpoint | Evidence you saw | Weight for an adapter buyer | Typical red flag |
|---|---|---|---|
| Plant identity matches safety file and contract | Licence, signage, file cover page | High | Different company name at reception |
| Mains-side component IQC | AVL, receipt records, part-number match | High | "The vendor certifies them" |
| Critical components list vs board | Line-by-line match on a live board | High | Unlisted Y-cap or optocoupler |
| Transformer barrier control | Margin tape / TIW, winding-stage hipot | High | No test until finished product |
| SMT paste, SPI/AOI, profile chart | Fridge log, station in use, dated chart | Medium | Paste at room temperature all shift |
| Wave solder | Temperature log, clean isolation slot | Medium | Bridging across primary/secondary |
| Housing weld and pin retention | Shift tear-down units | Medium | No destructive samples kept |
| 100% hipot and continuity | Voltage/time displayed, fixture, log | High | Sample-only hipot |
| Functional tester limits | Limits vs datasheet | High | Limits wider than spec |
| Burn-in duration/temp/load | Rack log, re-test after burn-in | High | Racks unloaded or unlogged |
| Environmental / mechanical lab | Dated log books, recent reports | Medium | Equipment present, log empty |
| Labelling, traceability, OQC | Label vs certificate, carton to lot | Medium | Carton cannot be traced |
Weight the high items at double. A plant that scores well on the eight high-weight rows and poorly on the four medium ones is fixable with an inspection plan. The reverse is not.
What a one-day visit cannot tell you
An audit day is a snapshot, usually a curated one. Three things it will not reveal, and how to close each gap:
- Whether the parts on your production run will be the parts you saw. Close it with a contractual critical-components clause: any substitution on the safety-critical list requires your written approval and an updated certification body letter.
- Whether the burn-in you watched is the burn-in your lot gets. Close it by specifying burn-in duration, temperature and load in the purchase order and requiring the burn-in log to ship with the lot.
- Whether the hipot tester was calibrated. Close it by asking for the calibration certificate on the day and noting the due date; then have your pre-shipment inspection agency — SGS, BV, Intertek or TÜV are the usual choices — repeat hipot and no-load power on the AQL sample.
The general discipline for what to inspect in a single day at a Chinese factory still applies: photograph everything, take serial numbers, and write the report the same evening while the details are fresh.
Common questions
How many units should I pull off the line during the audit?
Five is enough to check labels, critical components and housing weld; ask to keep two as reference samples and have them sealed and signed. Those become your golden samples for the pre-shipment inspection.
The factory says it holds UL, ETL, CE and GS files. Does that shorten the audit?
No. Safety approvals are issued per model, held by a named legal entity and carry their own expiry. On the day, ask for the certificate covering your exact model and check the issuing body, the holder name and the validity date on the document itself. Then use the critical components list from that file as your audit tool for checkpoints 2 and 3. A file in itself does not tell you whether today's production still matches it — that is what the audit is for.
What to ask the supplier next
Before you commit to a visit, send this list and ask for written answers. The replies tell you how to spend your day, and silence on any item tells you where to look first.
- Which legal entity will build the product, and which will appear on the safety file and the invoice?
- How many SMT lines and final-assembly lines run at the plant named in item 1?
- What is the incoming-inspection procedure for X/Y capacitors, fuses, optocouplers and bridge rectifiers, and who is on the approved vendor list?
- Production hipot: voltage, duration, 100% or sample, and calibration due date of the tester.
- Burn-in: rack capacity, duration, ambient temperature, load percentage, and whether units are re-tested after burn-in.
- Drop height and count, cable-flex cycle count and pass criteria for a release test, plus the last three reports.
- Outgoing AQL levels by defect class and the lot-to-test-log traceability method.
- Whether the two reference samples you seal on the day will be used as golden samples by the plant's own OQC.
Lexiang Power's factory profile is a useful template of what a supplier in this niche should be able to describe: a named 5,000 square metre plant with 200-plus staff, a listed process chain of SMT, wave solder, assembly and burn-in, and an in-house lab with salt-spray, thermal, drum-drop and cable-flex rigs. The figures it does not publish — line count, burn-in parameters, incoming-inspection policy — are exactly the ones on the list above, and they are the ones your audit day should be built around.