For equipment enquiries
State the intended process, input material, tube geometry, target wall construction, inspection methods, utilities, ventilation and installation conditions. Any proposed throughput or tolerance requires agreed test conditions.
For tubing enquiries
Provide ID, OD, wall thickness, length, tolerances, layer materials, operating environment and inspection requirements. Confirm whether the enquiry concerns tubing samples, repeat production or equipment to manufacture the tubing.
For acceptance
Define trial samples, inspection methods, factory acceptance and on-site acceptance responsibilities before approving a system. An agreed specification and actual test record are required; there is no published performance guarantee.